typo fixed
[libfirm] / ir / be / besched_t.h
index 6538d4f..8f6ddfc 100644 (file)
@@ -1,12 +1,38 @@
+/*
+ * Copyright (C) 1995-2008 University of Karlsruhe.  All right reserved.
+ *
+ * This file is part of libFirm.
+ *
+ * This file may be distributed and/or modified under the terms of the
+ * GNU General Public License version 2 as published by the Free Software
+ * Foundation and appearing in the file LICENSE.GPL included in the
+ * packaging of this file.
+ *
+ * Licensees holding valid libFirm Professional Edition licenses may use
+ * this file in accordance with the libFirm Commercial License.
+ * Agreement provided with the Software.
+ *
+ * This file is provided AS IS with NO WARRANTY OF ANY KIND, INCLUDING THE
+ * WARRANTY OF DESIGN, MERCHANTABILITY AND FITNESS FOR A PARTICULAR
+ * PURPOSE.
+ */
 
-#ifndef _BESCHED_T_H
-#define _BESCHED_T_H
+/**
+ * @file
+ * @brief       Scheduling utilities for nodes in Blocks and Blocks.
+ * @author      Sebastian Hack
+ * @version     $Id$
+ */
+#ifndef FIRM_BE_BESCHED_T_H
+#define FIRM_BE_BESCHED_T_H
 
 #define SCHED_INITIAL_GRANULARITY (1 << 14)
 
 #include "list.h"
 #include "irnode_t.h"
 #include "irgraph_t.h"
+#include "irphase_t.h"
+#include "irphases_t.h"
 
 #include "beutil.h"
 #include "besched.h"
@@ -17,25 +43,40 @@ extern size_t sched_irn_data_offset;
 
 /**
  * The schedule structure which is present at each ir node.
+ *
+ * Currently, only basic blocks are scheduled. The list head of
+ * every block schedule list is the Block list.
  */
 typedef struct _sched_info_t {
        struct list_head list;         /**< The list head to list the nodes in a schedule. */
-       sched_timestep_t time_step;    /**< If a is after b in a schedule, its time step is
-                                        larger than b's. */
-
-  int scheduled : 1;             /**< 1, if the node is in the schedule of the block, 0 else. */
+       unsigned idx;                  /**< The node index of the nodes this schedule info belongs to. */
+       sched_timestep_t time_step;    /**< If a is after b in a schedule, its time step is larger than b's. */
+       unsigned scheduled : 1;        /**< 1, if the node is in the schedule of the block, 0 else. */
 } sched_info_t;
 
-#define _sched_entry(list_head) (list_entry(list_head, sched_info_t, list))
+#define _sched_entry(list_head)             (list_entry(list_head, sched_info_t, list))
+#define get_irn_sched_info(irn)             ((sched_info_t *) get_or_set_irn_phase_info(skip_Proj_const(irn), PHASE_BE_SCHED))
+#define get_sched_info_irn(irg, sched_info) get_idx_irn((irg), (sched_info)->idx)
 
-#define get_irn_sched_info(irn) get_irn_data(irn, sched_info_t, sched_irn_data_offset)
-#define get_sched_info_irn(sched_info) get_irn_data_base(sched_info, sched_irn_data_offset)
+/**
+ * Returns non-zero if schedule information is available
+ * for a given graph.
+ * @param irg  The graph.
+ */
+static INLINE int _have_sched_info(const ir_graph *irg)
+{
+       return get_irg_phase(irg, PHASE_BE_SCHED) != NULL;
+}
 
 /**
- * Init the scheduling stuff.
- * To be called from the central backend initialization routine.
+ * Check, if the node is scheduled.
+ * @param irn The node.
+ * @return 1, if the node is scheduled, 0 if not.
  */
-void be_sched_init(void);
+static INLINE int _sched_is_scheduled(const ir_node *irn)
+{
+       return get_irn_sched_info(irn)->scheduled;
+}
 
 /**
  * Get the time step of an irn in a schedule.
@@ -44,6 +85,7 @@ void be_sched_init(void);
  */
 static INLINE int _sched_get_time_step(const ir_node *irn)
 {
+       assert(_sched_is_scheduled(irn));
        return get_irn_sched_info(irn)->time_step;
 }
 
@@ -58,11 +100,13 @@ static INLINE int to_appear_in_schedule(const ir_node *irn)
        switch(get_irn_opcode(irn)) {
                case iro_Start:
                case iro_Jmp:
+               case iro_Break:
                        return 1;
+               case iro_Proj:
+                       return 0;
                default:
                        return is_data_node(irn);
        }
-
 }
 
 /**
@@ -72,7 +116,7 @@ static INLINE int to_appear_in_schedule(const ir_node *irn)
  */
 static INLINE int _sched_has_next(const ir_node *irn)
 {
-  const ir_node *block = is_Block(irn) ? irn : get_nodes_block(irn);
+       const ir_node *block = is_Block(irn) ? irn : get_nodes_block(irn);
        const sched_info_t *info = get_irn_sched_info(irn);
        const sched_info_t *block_info = get_irn_sched_info(block);
        return info->list.next != &block_info->list;
@@ -85,7 +129,7 @@ static INLINE int _sched_has_next(const ir_node *irn)
  */
 static INLINE int _sched_has_prev(const ir_node *irn)
 {
-  const ir_node *block = is_Block(irn) ? irn : get_nodes_block(irn);
+       const ir_node *block = is_Block(irn) ? irn : get_nodes_block(irn);
        const sched_info_t *info = get_irn_sched_info(irn);
        const sched_info_t *block_info = get_irn_sched_info(block);
        return info->list.prev != &block_info->list;
@@ -99,7 +143,7 @@ static INLINE int _sched_has_prev(const ir_node *irn)
 static INLINE ir_node *_sched_next(const ir_node *irn)
 {
        const sched_info_t *info = get_irn_sched_info(irn);
-       return get_sched_info_irn(_sched_entry(info->list.next));
+       return get_sched_info_irn(get_irn_irg(irn), _sched_entry(info->list.next));
 }
 
 /**
@@ -111,7 +155,7 @@ static INLINE ir_node *_sched_next(const ir_node *irn)
 static INLINE ir_node *_sched_prev(const ir_node *irn)
 {
        const sched_info_t *info = get_irn_sched_info(irn);
-       return get_sched_info_irn(_sched_entry(info->list.prev));
+       return get_sched_info_irn(get_irn_irg(irn), _sched_entry(info->list.prev));
 }
 
 /**
@@ -144,31 +188,31 @@ static INLINE ir_node *_sched_last(const ir_node *block)
  */
 void sched_renumber(const ir_node *block);
 
-static INLINE void _sched_set_time_stamp(ir_node *irn)
+static INLINE void _sched_set_time_stamp(const ir_node *irn)
 {
-  sched_info_t *inf = get_irn_sched_info(irn);
-  sched_timestep_t before_ts = _sched_entry(inf->list.prev)->time_step;
-  sched_timestep_t after_ts = _sched_entry(inf->list.next)->time_step;
-
-  /*
-   * If we are the last, we can give us a big time step,
-   * else we have to compute our time step from our
-   * neighbours.
-   */
-  if(before_ts >= after_ts)
-    inf->time_step = before_ts + SCHED_INITIAL_GRANULARITY;
-  else {
-    sched_timestep_t ts = (before_ts + after_ts) / 2;
-
-    /*
-     * If the resolution went out, we have to renumber
-     * this block.
-     */
-    if(ts == before_ts || ts == after_ts)
-      sched_renumber(get_nodes_block(irn));
-    else
-      inf->time_step = ts;
-  }
+       sched_info_t *inf = get_irn_sched_info(irn);
+       sched_timestep_t before_ts = _sched_entry(inf->list.prev)->time_step;
+       sched_timestep_t after_ts = _sched_entry(inf->list.next)->time_step;
+
+       /*
+        * If we are the last, we can give us a big time step,
+        * else we have to compute our time step from our
+        * neighbours.
+        */
+       if(before_ts >= after_ts)
+               inf->time_step = before_ts + SCHED_INITIAL_GRANULARITY;
+       else {
+               sched_timestep_t ts = (before_ts + after_ts) / 2;
+
+               /*
+                * If the resolution went out, we have to renumber
+                * this block.
+                */
+               if(ts == before_ts || ts == after_ts)
+                       sched_renumber(get_nodes_block(irn));
+               else
+                       inf->time_step = ts;
+       }
 }
 
 /**
@@ -177,13 +221,15 @@ static INLINE void _sched_set_time_stamp(ir_node *irn)
  * @param irn The node to add.
  * @return The given node.
  */
-static INLINE ir_node *_sched_add_before(ir_node *before, ir_node *irn)
+static INLINE void _sched_add_before(const ir_node *before, const ir_node *irn)
 {
        sched_info_t *info = get_irn_sched_info(irn);
+       assert(_sched_is_scheduled(before));
+       assert(!_sched_is_scheduled(irn));
+       assert(!is_Proj(irn));
        list_add_tail(&info->list, &get_irn_sched_info(before)->list);
        _sched_set_time_stamp(irn);
        info->scheduled = 1;
-       return irn;
 }
 
 /**
@@ -192,35 +238,41 @@ static INLINE ir_node *_sched_add_before(ir_node *before, ir_node *irn)
  * @param irn The node to add.
  * @return The given node.
  */
-static INLINE ir_node *_sched_add_after(ir_node *after, ir_node *irn)
+static INLINE void _sched_add_after(const ir_node *after, const ir_node *irn)
 {
        sched_info_t *info = get_irn_sched_info(irn);
+       assert(_sched_is_scheduled(after));
+       assert(!_sched_is_scheduled(irn));
+       assert(!is_Proj(irn));
        list_add(&info->list, &get_irn_sched_info(after)->list);
        _sched_set_time_stamp(irn);
        info->scheduled = 1;
-       return irn;
 }
 
-/**
- * Remove a node from the scheduled.
- * @param irn The node.
- */
-static INLINE void _sched_remove(ir_node *irn)
+static INLINE void _sched_init_block(const ir_node *block)
 {
-  sched_info_t *info = get_irn_sched_info(irn);
-  list_del(&info->list);
+       sched_info_t *info = get_irn_sched_info(block);
+       assert(info->scheduled == 0 && info->time_step == 0);
        INIT_LIST_HEAD(&info->list);
-  info->scheduled = 0;
+       info->scheduled = 1;
+}
+
+static INLINE void _sched_reset(const ir_node *node)
+{
+       sched_info_t *info = get_irn_sched_info(node);
+       info->scheduled = 0;
 }
 
 /**
- * Check, if the node is scheduled.
+ * Remove a node from the scheduled.
  * @param irn The node.
- * @return 1, if the node is scheduled, 0 if not.
  */
-static INLINE int _sched_is_scheduled(const ir_node *irn)
+static INLINE void _sched_remove(const ir_node *irn)
 {
-  return get_irn_sched_info(irn)->scheduled;
+       sched_info_t *info = get_irn_sched_info(irn);
+       list_del(&info->list);
+       INIT_LIST_HEAD(&info->list);
+       info->scheduled = 0;
 }
 
 /**
@@ -232,26 +284,12 @@ static INLINE int _sched_is_scheduled(const ir_node *irn)
  */
 static INLINE int _sched_cmp(const ir_node *a, const ir_node *b)
 {
-  assert(_sched_is_scheduled(a) && _sched_is_scheduled(b));
-  assert(get_nodes_block(a) == get_nodes_block(b));
+       assert(_sched_is_scheduled(a) && _sched_is_scheduled(b));
+       assert(get_nodes_block(a) == get_nodes_block(b));
 
-  return get_irn_sched_info(a)->time_step - get_irn_sched_info(b)->time_step;
+       return get_irn_sched_info(a)->time_step - get_irn_sched_info(b)->time_step;
 }
 
-/**
- * Verify a schedule.
- * @param block The block whose schedule to verify.
- * @return      1, if the schedule is proper, 0 if not.
- */
-extern int sched_verify(const ir_node *block);
-
-/**
- * Verify the schedules in all blocks of the irg.
- * @param irg The program graph.
- * @return    1, if all schedules were right, 0 if not.
- */
-extern int sched_verify_irg(ir_graph *irg);
-
 /**
  * Checks, if one node is scheduled before another.
  * @param n1   A node.
@@ -263,7 +301,7 @@ static INLINE int _sched_comes_after(const ir_node *n1, const ir_node *n2)
 {
        assert(_sched_is_scheduled(n1));
        assert(_sched_is_scheduled(n2));
-       assert(get_nodes_block(n1) == get_nodes_block(n2));
+       assert((is_Block(n1) ? n1 : get_nodes_block(n1)) == (is_Block(n2) ? n2 : get_nodes_block(n2)));
        return _sched_get_time_step(n1) < _sched_get_time_step(n2);
 }
 
@@ -275,34 +313,50 @@ static INLINE int _sched_comes_after(const ir_node *n1, const ir_node *n2)
  */
 typedef int (sched_predicator_t)(const ir_node *irn, void *data);
 
-
+/**
+ * Predicate for sched_skip(), returns non-zero if irn is a control flow changing node.
+ *
+ * @param irn   the node to evaluate
+ * @param data  an arch_env_t * used to determine if irn is a cf
+ *              node for the given architecture
+ */
 int sched_skip_cf_predicator(const ir_node *irn, void *data);
+
+/**
+ * Predicate for sched_skip(), returns non-zero if irn is a Phi node.
+ *
+ * Used with sched_skip().
+ *
+ * @param irn  the node to evaluate
+ * @param data unused
+ */
 int sched_skip_phi_predicator(const ir_node *irn, void *data);
 
 /**
  * Skip nodes in a schedule.
- * @param from The node to start from.
- * @param forward The direction (1 for forward, 0 for backward).
- * @param predicator The one who decides what is skipped.
- * @param data Food for the predicator.
- * @return The first node rejected by the predicator or the block
- * itself if none was rejected.
+ * @param from        The node to start from.
+ * @param forward     The direction (1 for forward, 0 for backward).
+ * @param predicator  The predicator function which decides what is skipped.
+ * @param data        context parameter for the predicator.
+ *
+ * @return The first node not rejected by the predicator or the block
+ *         itself if all nodes were rejected.
  */
-extern ir_node *sched_skip(ir_node *from, int forward,
-    sched_predicator_t *predicator, void *data);
-
-#define sched_get_time_step(irn)           _sched_get_time_step(irn)
-#define sched_has_succ(irn)                    _sched_has_succ(irn)
-#define sched_has_prev(irn)                    _sched_has_prev(irn)
-#define sched_succ(irn)                                _sched_succ(irn)
-#define sched_prev(irn)                                _sched_prev(irn)
-#define sched_first(irn)                               _sched_first(irn)
-#define sched_last(irn)                                _sched_last(irn)
-#define sched_add_before(before, irn)  _sched_add_before(before, irn)
-#define sched_add_after(after, irn)    _sched_add_after(after, irn)
-#define sched_remove(irn)              _sched_remove(irn)
+ir_node *sched_skip(ir_node *from, int forward, sched_predicator_t *predicator, void *data);
+
+#define have_sched_info(irg)            _have_sched_info(irg)
+#define sched_get_time_step(irn)        _sched_get_time_step(irn)
+#define sched_has_next(irn)             _sched_has_next(irn)
+#define sched_has_prev(irn)             _sched_has_prev(irn)
+#define sched_next(irn)                 _sched_next(irn)
+#define sched_prev(irn)                 _sched_prev(irn)
+#define sched_first(irn)                _sched_first(irn)
+#define sched_last(irn)                 _sched_last(irn)
+#define sched_add_before(before, irn)   _sched_add_before(before, irn)
+#define sched_add_after(after, irn)     _sched_add_after(after, irn)
+#define sched_remove(irn)               _sched_remove(irn)
 #define sched_is_scheduled(irn)         _sched_is_scheduled(irn)
-#define sched_comes_after(n1, n2)       _sched_comes_after(n1, n1)
+#define sched_comes_after(n1, n2)       _sched_comes_after(n1, n2)
 #define sched_cmp(a, b)                 _sched_cmp(a, b)
 
-#endif
+#endif /* FIRM_BE_BESCHED_T_H */