pressure stats
[libfirm] / ir / be / besched_t.h
index 54f59db..498aced 100644 (file)
@@ -8,6 +8,7 @@
 #include "irnode_t.h"
 #include "irgraph_t.h"
 
+#include "beutil.h"
 #include "besched.h"
 
 typedef unsigned int sched_timestep_t;
@@ -16,6 +17,9 @@ extern size_t sched_irn_data_offset;
 
 /**
  * The schedule structure which is present at each ir node.
+ *
+ * Currently, only basic blocks are scheduled. The list head of
+ * every block schedule list is the Block list.
  */
 typedef struct _sched_info_t {
        struct list_head list;         /**< The list head to list the nodes in a schedule. */
@@ -52,17 +56,16 @@ static INLINE int _sched_get_time_step(const ir_node *irn)
  * @param irn The node to check for.
  * @return 1, if the node consumes/produces data, false if not.
  */
-static INLINE int to_appear_in_schedule(ir_node *irn)
+static INLINE int to_appear_in_schedule(const ir_node *irn)
 {
-  int i, n;
-
-  for(i = 0, n = get_irn_arity(irn); i < n; ++i) {
-    ir_node *op = get_irn_n(irn, i);
-    if(mode_is_datab(get_irn_mode(op)))
-      return 1;
-  }
-
-  return mode_is_datab(get_irn_mode(irn));
+       switch(get_irn_opcode(irn)) {
+               case iro_Start:
+               case iro_Jmp:
+               case iro_Break:
+                       return 1;
+               default:
+                       return is_data_node(irn);
+       }
 }
 
 /**
@@ -194,10 +197,10 @@ static INLINE ir_node *_sched_add_before(ir_node *before, ir_node *irn)
  */
 static INLINE ir_node *_sched_add_after(ir_node *after, ir_node *irn)
 {
-  sched_info_t *info = get_irn_sched_info(irn);
+       sched_info_t *info = get_irn_sched_info(irn);
        list_add(&info->list, &get_irn_sched_info(after)->list);
-  _sched_set_time_stamp(irn);
-  info->scheduled = 1;
+       _sched_set_time_stamp(irn);
+       info->scheduled = 1;
        return irn;
 }
 
@@ -209,11 +212,12 @@ static INLINE void _sched_remove(ir_node *irn)
 {
   sched_info_t *info = get_irn_sched_info(irn);
   list_del(&info->list);
+       INIT_LIST_HEAD(&info->list);
   info->scheduled = 0;
 }
 
 /**
- * Check, if thenode is scheduled.
+ * Check, if the node is scheduled.
  * @param irn The node.
  * @return 1, if the node is scheduled, 0 if not.
  */
@@ -251,6 +255,21 @@ extern int sched_verify(const ir_node *block);
  */
 extern int sched_verify_irg(ir_graph *irg);
 
+/**
+ * Checks, if one node is scheduled before another.
+ * @param n1   A node.
+ * @param n2   Another node.
+ * @return     1, if n1 is in front of n2 in the schedule, 0 else.
+ * @note       Both nodes must be in the same block.
+ */
+static INLINE int _sched_comes_after(const ir_node *n1, const ir_node *n2)
+{
+       assert(_sched_is_scheduled(n1));
+       assert(_sched_is_scheduled(n2));
+       assert(get_nodes_block(n1) == get_nodes_block(n2));
+       return _sched_get_time_step(n1) < _sched_get_time_step(n2);
+}
+
 /**
  * A predicate for a node.
  * @param irn The node.
@@ -275,17 +294,18 @@ int sched_skip_phi_predicator(const ir_node *irn, void *data);
 extern ir_node *sched_skip(ir_node *from, int forward,
     sched_predicator_t *predicator, void *data);
 
-#define sched_get_time_step(irn)           _sched_get_time_step(irn)
-#define sched_has_succ(irn)                              _sched_has_succ(irn)
-#define sched_has_prev(irn)                              _sched_has_prev(irn)
-#define sched_succ(irn)                                                  _sched_succ(irn)
-#define sched_prev(irn)                                                  _sched_prev(irn)
-#define sched_first(irn)                                                 _sched_first(irn)
-#define sched_last(irn)                                                  _sched_last(irn)
-#define sched_add_before(before, irn)  _sched_add_before(before, irn)
-#define sched_add_after(after, irn)    _sched_add_after(after, irn)
-#define sched_remove(irn)              _sched_remove(irn)
-#define sched_is_scheduled(irn)       _sched_is_scheduled(irn)
-#define sched_cmp(a, b)               _sched_cmp(a, b)
+#define sched_get_time_step(irn)        _sched_get_time_step(irn)
+#define sched_has_next(irn)             _sched_has_next(irn)
+#define sched_has_prev(irn)             _sched_has_prev(irn)
+#define sched_next(irn)                 _sched_next(irn)
+#define sched_prev(irn)                 _sched_prev(irn)
+#define sched_first(irn)                _sched_first(irn)
+#define sched_last(irn)                 _sched_last(irn)
+#define sched_add_before(before, irn)   _sched_add_before(before, irn)
+#define sched_add_after(after, irn)     _sched_add_after(after, irn)
+#define sched_remove(irn)               _sched_remove(irn)
+#define sched_is_scheduled(irn)         _sched_is_scheduled(irn)
+#define sched_comes_after(n1, n2)       _sched_comes_after(n1, n2)
+#define sched_cmp(a, b)                 _sched_cmp(a, b)
 
 #endif